Case Introduction
This project is in line with the requirements of environmental protection of large environmental stone factory built, three 1200 tons/hour production line arranged side by side, the production line total output of more than 30.000 tons per day, the whole production line by the new high-tech Group to build and provide the required equipment.
Application areas
water conservancy project
high speed railway
Airport construction
roadworks
National highway widening
Commercial mixed station
commercial concrete
Commercial housing construction

Related configuration